Ml - heavy duty lift mechanism – Future Automation ML User Manual

Page 14

Advertising
background image

Before mounting any screen,
press STOP on the IR remote in
order to prevent any motor
movements during the mounting
procedure.

Simply mount the screen on to
the mount supplied with your
mechanism. The example below
shows a Group A framework.

Mounting the Screen to the Lift

The height of the inner framework is adjustable
in 30mm increments. There is then the final
fine adjustment available from 30mm slots in
the side. The inner uprights will slide to allocate
different mounting systems.

When the screen is in position, the cables
can be connected and run up into the
cabinet.

Pass the cables through the hole you cut
in the base for the cables. Once inside the
cabinet, pass the cables in to the cable
management system. This resembles a
black chain running from the beam to the
base of the cabinet that the cables can be
pushed inside to keep them tidy.

In

st

al

la

ti

o

n

:

S

ta

ge

9

Page 13 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

ML - Heavy Duty Lift Mechanism

Advertising
This manual is related to the following products:

MLI, PL, PLI, HL