Future Automation SPS User Manual

Page 17

Advertising
background image

In

st

all

at

io

n

: S

ta

ge

1

0

Page 16 of 28 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

Connecting the Mechanisms









To connect the three mechanisms together electrically, is very simple.

To connect the Drive Unit to the Side Panels connect the 9 pin AMP plugs together
labelled A to A.

Each mechanism has a set of wires coming from it. On the ends of the wires are
control box inserts and block connectors.

These wires are marked with a label telling you which set of connectors the block
connectors must go to.

The inserts then slide into the slots on the side of the control box.

Control Box
Inserts

SPS SPLIT V & H - Sliding Panel System Split Vertical & Horizontal











A

A

Advertising