Future Automation SPS User Manual

Page 6

Advertising
background image

In

st

al

la

ti

o

n

:

S

ta

ge

1

Page 5 of 28 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

Before You Begin 1
Preliminary Checks

It is important to check various
dimensions against the Technical sheet
for this mechanism prior to starting the
installation.

It is well worth setting up the mechanism
out of the cabinet to familiarise yourself
with the general operation.

Set up as shown. The panel drive unit
shafts engage with the couplers on the
panel mechanism. See detail A, right.
The M5 x 35mm bolts connects them.





Plug the units together with the leads from the control box. The panel mechanism
connection can be found tucked in one end of one of the mechanisms. See sheet
16 stage 10 for further details of the electrical connections. Plug the infrared receiver
cable into the 3.5mm Jack connector.

Plug into the mains and press 'OUT' on the remote control. The panel mechanism
should initially move back and then move off to the side. The plasma advance unit
should then move out. Pressing 'IN' on the control reverses the operation. 'STOP' is
the Stop.

Do not adjust any of the cams on the mechanism.
They are factory set to the correct positions. If you
think you need to make adjustments to the cam
please contact Future Automation first.

NOTE:
Panel Advance Shaft rotates 180 degrees
to create a forward-back motion of 40mm.
If out of sync by 180 degrees it may jam.

Panel
Moving
Shaft

Panel

Advance

Shaft

NOTE:
The mechanism is set up to move
about panel height + 30mm.

SPS SPLIT V & H - Sliding Panel System Split Vertical & Horizontal





Advertising