3 redundancy operations, 1 shelf manager switchover – Artesyn Centellis 4410 (AXP-1410) Installation and Use (July 2014) User Manual

Page 133

Advertising
background image

Configuring and Operating the System

AXP 1410 Installation and Use (6806800H70L)

133

5.7.3

Redundancy Operations

This section describes what happens during shelf manager switchover, takeover, failover, and
when a shelf manager is inserted or extracted.

5.7.3.1

Shelf Manager Switchover

During a switchover, the active and the standby shelf manager change their roles. The system
manager initiates and controls this process on the active shelf manager. A switchover is, for
example, necessary when the active shelf manager needs to be extracted. Since only the
standby shelf manager can be extracted, a switchover needs to take place.

Advertising
This manual is related to the following products: