Artesyn COMX-P40x0 ENP2 Installation and Use (January 2015) User Manual
Page 40

Hardware Preparation and Installation
COMX-P40x0 ENP2 Installation and Use (6806800R95C)
40
Shipment Inspection
1. Verify that you have received all items of your shipment.
COMX-P40x0-ENP2 Module
One printed copy of Quick Start Guide
One printed copy of Safety Notes Summary
Any other optional items that you ordered
2. Check for damage and report any damage or differences to customer service.
3. Remove the desiccant bag shipped together with the enclosure and dispose of it
according to your country’s legislation.
2.3
Installing and Removing the Module on the
Carrier Board
Installing the COM Express module on the carrier board
1. Line up the board-to-board connector of the module assembly with the board-to-board
connector of the carrier board.
2. Make sure that the inter-connectors are properly aligned and that the five standoffs on the
module have contact with the top of the carrier board.
Improperly disposing of used products may harm the environment.
Always dispose of used products according to your country’s legislation and manufacturer’s
instructions.
The product is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact customer service immediately.