System configuration one-line diagram – Basler Electric DGC-2020HD User Manual

Page 56

Advertising
background image

46

9469300990 Rev B

•

Multigen Management

o

AVR Output

o

GOV Output

o

LS (Load Share) Output

o

Demand Start/Stop

o

Sequencing

o

Network Configuration

•

Programmable Inputs

o

Contact Inputs

o

Analog Inputs

o

Remote Contact Inputs

o

Remote Analog Inputs

o

Remote RTD Inputs

o

Remote Thermocouple Inputs

o

Programmable Functions

•

Programmable Outputs

o

Configurable Elements

o

Remote Analog Outputs

•

Logic

o

Logic Timers (1-8)

o

Logic Timers (9-16)

o

Logic Counters

Summary

•

System Configuration One-Line Diagram

•

Mains Fail St (Status)

o

Mains Fail St (Status)

o

Transfer Delay

o

Return Delay

o

Max Transfer Time

o

Max Parallel Time

o

Open Transition Delay

•

Gen VLL

•

Gen Hz

•

Gen Aac

•

kW

•

kvar

•

PF (Power Factor)

•

PF Lead/Lag

•

Bus1 VLL

•

Bus1 Hz

•

Bus2 VLL (optional)

•

Bus2 Hz (optional)

•

GB Command

o

Open, Close, or None

•

MB Command

o

Open, Close, or None

System Configuration One-Line Diagram

A one-line diagram of the system breaker configuration is displayed on the front panel. This diagram
changes in real time to reflect the current state of the breakers.

The one-line diagram appears on both the front panel Overview and Summary screens. The Summary
screen provides metering for generator and bus parameters as well as breaker controls. The one-line
diagram is displayed at the top, generator and bus parameters are displayed below that, and breaker

Controls and Indicators

DGC-2020HD

Advertising