Installation – Desa E36L User Manual

Page 6

Advertising
background image

www.desatech.com

111076-01F

6

6. Swing junction box with harness to left

side while pulling sufficient length of har-
ness out through control panel cover to
reach mounting location on left side.

7. Reinsert retaining flange through slot and

swing screw mounting tab back through
notch as before.

8. Slide junction box down until mounting

holes line up and replace inner retaining
cover.

9. Pull end of 3 wire Romex supply line

through universal strain relief bushing in
remaining cover.

10. Strip back outer Romex to about 4” and

connect black, white and green wires ac-
cordingly using approved connectors.

Screws
and
Outer
Cover

Junction Box

Mounting
Tab

Notch

Retaining
Flange

Slot

Screws and
Outer Cover
from Other Side

Cover with
Universal
Strain Relief

Figure 7 - Relocating Junction Box to

Left

INSTALLATION

Continued

Junction Box

Figure 8 - Removing Shipping Brace

Foam
Shipping
Brace

Motor.
Mount

11. Tuck tailing wires into junction box and

replace cover using 2 remaining screws.

12. Tighten down strain adjustment on uni-

versal bushing until Romex sheathing is
secured.

IMPORTANT: Inspect components and wir-
ing for damage before connecting power to
unit. If any components are found damaged,
contact an authorized dealer for original DESA
Heating Products replacement part(s) or call
DESA Heating Products at 1-866-872-6040
for referral.
IMPORTANT: Prior to operation remove foam
shipping brace located under motor mount
(see Figure 8).

Advertising
This manual is related to the following products: