Inspecting the equipment, Included parts – Comtech EF Data HPCST-5000 User Manual
Page 86

Redundant System Installation
High-Power C-Band Satellite Terminal
4–4
Rev. 0
4.2
Inspecting the Equipment
1. Carefully check the equipment for possible damage incurred during shipment.
2. Carefully check the equipment against the packing list shipped with the
equipment to ensure that the shipment is complete.
4.2.1 Included
Parts
A typical redundant HPCST-5000 configuration contains the following components.
Notes:
1. Hardware required to perform this task is located in Chapter 8, Equipment List.
2. Because each system can be custom ordered, it is beyond the scope of this
manual to provide the unlimited configuration possibilities.
3. This chapter does not describe the installation procedures for amplifiers, high
performance LNAs, phase-locked LNBs, LNBs, and phase-locked block
converters.