Chapter 2: single thread system installation, Unpacking, Chapter 2. single thread system installation – Comtech EF Data KST-12025 User Manual
Page 31

Rev. 1
2–1
2
Chapter 2.
SINGLE THREAD SYSTEM
INSTALLATION
This chapter provides installation information for single thread systems, including:
•
Unpacking and inspecting the parts
•
Installing the RFT
•
Installing the LNA and flexible waveguide
•
External connections
For redundant systems, refer to Chapter 3.
2.1 Unpacking
The KST-12025 terminal system is packaged in preformed, reusable foam inside a
cardboard carton.
Before unpacking the carton components, ensure that there is plenty of room around the
carton for workspace. A large table is recommended.
To remove the parts:
1. Cut the tape at the top of the carton where it is indicated OPEN THIS END.
2. Lift out the cardboard/foam spacer covering the unit.
3. Remove each part from the carton. Refer to Section 2.2.1 for a parts breakdown.
C AU TIO N
Because the RFT is heavy, assistance may be necessary to remove
the unit from the box.
Note: Save the packing material for reshipment.