4.0 START UP

The HYDRA Analyzer and Sensor was assembled and tested at the factory before shipment. The sensor

was then disconnected from the analyzer, cleaned and packaged for shipment. The HYDRA C22 analyzer

is configured as shown below and should be ready to use aside from any changes the user may wish to

make to the Outputs, Cleaning Timers and Alarm Set points.

Complete all of the steps in Section 2 INSTALLATION (above) before proceeding further. These steps

include:

1.

Install the Analyzer in a suitable environment.

2.

Determine an installation method and representative sample point for the sensor.

3.

Connect the Air Blast Spray Cleaner tube to a solenoid controlled air supply, 1-4 bar (15-60 psig).

4.

Wire the Power, Outputs, Contact Relays and the HYDRA Sensor to the HYDRA C22 Analyzer.

Familiarize yourself with the MENU Structure of the HYDRA C22 Analyzer, Section 3 (above).

4.1 SET-UP AND CONFIGURATION

The HYDRA C22 analyzer is configured as shown below. Changes to the default configuration can be

easily made as described in Section 3 above.

4.1.1 Set Up Menus, Standard

Ch 1 Setup Menu

Settings

Settings

Plot 4-20 1
Sample .1 m

4mA1 0.1 ppb
20mA1 50.00 ppm


2 On > 10.00 ppm
2 Off < 9.500 ppm

Timer 1 : periodic

Per 0d00 :15 :00
Now 0 00 :00 :00
On 0 00 :00 :00
Off 0 00 :00 :30

Timer 2 : oneshot↑

Now 0 00 :00 :00
On 0 00 :00 :00
Off 0 00 :01 :30

Ks 0.10
K+ comp On

TC .333 %/°C
Isopot XXX.X mV
Equilib 9.24 pH
Dissoc 1.000 On

Noise filter 5

Ch 2 Setup Menu

Settings

Settings

TC .333 %/°C
Isopot XXX.X mV

Noise filter 5