11 spring holder installation, 12 centering device installation – Flowserve PSS III Durametallic User Manual

Page 13

Advertising
background image

13

11 Spring Holder Installation

11.1 Place the coil springs in the

spring holes. See Figure 28.

11.2 Set the gland half face down on

the table and insert half of the

spring holder into the gland.

See Figure 29.

11.3 Lubricate one end of the

lock pins and set them into the

lock pin holes in the gland and

align them with the holes in the

spring holder.

11.4 Keep the spring holder snug in

the gland bore and press the

lock pins into the spring holder

until the pins extend 1.5 mm

(0.06 inch) out of the gland.

See Figure 30.

11.5 Repeat this procedure for the

other gland half.

Figure 28

Figure 29

12 Centering Device Installation

Figure 31

12.1 Place one gland half on the

table face down.

12.2 Position the centering devices at

the gland locating holes and

press their tabs into the locating

holes. The locating holes are

positioned 45 degrees from the

split joints and are even with the

bolt slots. See Figure 31.

12.3 Repeat this procedure for the

other gland half.

Figure 30

1.5mm (0.06 inch)

Advertising