Flowserve SMB Series Electric Actuators User Manual

Page 69

Advertising
background image

69

SMB Series/SB Series Installation and Maintenance FCD LMENIM1401-04-AQ – 01/15

flowserve.com

8. Remove declutch assembly as follows:

a. Clean grease from assembly as much as possible.

b. Scribe an alignment mark on all parts and shaft for use during reassembly.

c. Remove the Declutch Lever Stop (piece #28), Tripper Spring (piece #67), Clutch Tripper #1 and

#2 (piece #33 and #34), and Roll Pin (piece #110).

d. Loosen set screws on Declutch Lever (piece #9) and Collar (piece #103).

e. Remove the Declutch Lever (piece #9), Declutch Cap (piece #59), and slide the Declutch Shaft

(piece #30) out through the bottom of the Declutch Housing (piece #2), while removing the
Declutch Fork (piece #14) and other Declutch Shaft Mounted Components (piece #66, 70, 69,
and #103) from the Declutch Shaft (piece #30).

9. Remove the Handwheel Shaft and Pinion (piece #40), noting how many and which spacers go on

either side of the Declutch Fork (piece #14).

10. Remove the Solid Drive Shaft (piece #43) and the Flexible Jaw Clutch assembly (pieces 50, 73,

74, 75, 76, 97, and 98) as an integral assembly, Gear Clutch Spacer (piece #47), Sliding Clutch
Gear (piece #51), and Clutch Compression Spring (piece #68).

11. Remove Splined Insert (piece #54) using jack screws, Spirolox Ring (piece #107), and

Handwheel Gear (piece #6).

12. Remove Gear Mounting Bracket (piece #8) using jackscrews, Bearing (piece #93), and Bearing

Adapter (piece #65).

13. Pull Hollow Drive Shaft (piece #55) toward declutch end and remove Spirolox Ring (piece #106).

c

WARNING: Declutch Housing is under torque spring load.

14. Remove Declutch Housing (piece #2) by loosening the two cap screws evenly and in turn to

allow gradual release of the torque spring preload.

15. Push Hollow Drive Shaft (piece #55) toward the Motor (piece #115) end, loosen set screw, and

remove Bearing Locknut (piece #99).

NOTE: Hold hollow drive shaft using adjustable spanner on splines.

a. Remove Bearing (piece #95) by pushing Hollow Drive Shaft (piece #55) toward declutch end.

b. Remove Geared Limit Threaded Collar (piece #32) and key.

c. Remove Hollow Drive Shaft (piece #55) from declutch end of the Housing (piece #1).

16. Loosen set screw in Cartridge Stem Locking Nut (piece #48) and temporarily replace Declutch

Housing (piece #2) with two screws to compress the torque spring.

c

WARNING: Declutch Housing is under spring load.

17. Remove Cartridge Stem Locking Nut (piece #48).

18. Remove Declutch Housing (piece #2) by loosening the two cap screws evenly and in turn to

allow gradual release of the torque spring preload.

19. Pull Bearing Cartridge Stem (piece #45) out partially and remove the Thrust Washers (piece #46),

Torque Limit Sleeve (piece #62), and Belleville Springs (piece #58).

20. Remove bearing cartridge/worm assembly from the Housing (piece #1).

Advertising
This manual is related to the following products: