Example of installation, Fig. 9, Boiler drum – Flowserve LRG 16-40 User Manual

Page 19: Shut-off valve gav, Continuous blowdown valve bae 36, Measuring pot key, Lrg 6-40

Advertising
background image

9

M

RT

S

EG

A

ts

yS

ma

et

S

m

e
s

RT

S

EG

A

ts

yS

ma

et

S

m

e
s

R

TS

E

G

A

1-

6

1

TG

R

L

R

TS

E

G

A

1-

6

1

TG

R

L

mp

p-

S

µ

Example of Installation

– continued –

LRG 6-40

Fig. 9

Conductivity metering and continuous boiler blowdown, installation of electrode LRG 6-40 in top

blowdown line via separate measuring pot

E

Joint ring

∅ 33 x 39, form D, DIN 7603, material: .430, bright-annealed

4

Boiler drum

5

Shut-off valve GAV

6

Continuous blowdown valve BAE 36

7

Measuring pot

Key

Outlet

DN 5-40

DN 5-40

Inlet

" BSP (ISO 8-)

6

5

Advertising
This manual is related to the following products: