Example of installation, Fig. 9, Boiler drum – Flowserve LRG 16-40 User Manual
Page 19: Shut-off valve gav, Continuous blowdown valve bae 36, Measuring pot key, Lrg 6-40
Advertising
9
M
RT
S
EG
A
ts
yS
ma
et
S
m
e
s
RT
S
EG
A
ts
yS
ma
et
S
m
e
s
R
TS
E
G
A
1-
6
1
TG
R
L
R
TS
E
G
A
1-
6
1
TG
R
L
mp
p-
S
µ
Example of Installation
– continued –
LRG 6-40
Fig. 9
Conductivity metering and continuous boiler blowdown, installation of electrode LRG 6-40 in top
blowdown line via separate measuring pot
E
Joint ring
∅ 33 x 39, form D, DIN 7603, material: .430, bright-annealed
4
Boiler drum
5
Shut-off valve GAV
6
Continuous blowdown valve BAE 36
7
Measuring pot
Key
Outlet
DN 5-40
DN 5-40
Inlet
" BSP (ISO 8-)
6
5
Advertising
This manual is related to the following products: