Installation – Desa VN600BA User Manual

Page 11

Advertising
background image

www.desatech.com

110720-01J

11

Installation must include equipment shutoff valve,

union and plugged 1/8" NPT tap. Locate NPT tap

within reach for test gauge hook up. NPT tap must

be upstream from heater (see Figure 13).
IMPORTANT:

Install an equipment shutoff valve

in an accessible location. The equipment shutoff

valve is for turning on or shutting off the gas to

the appliance.
Check your building codes for any special re-

quirements for locating equipment shutoff valve

to fireplaces.
Apply pipe joint sealant lightly to male NPT

threads. This will prevent excess sealant from

going into pipe. Excess sealant in pipe could result

in clogged heater valves.

WARNING: Use pipe joint

sealant that is resistant to liquid

petroleum (LP) gas.

We recommend that you install sediment trap in

supply line as shown in Figure 13. Locate sediment

trap where it is within reach for cleaning. Install

in piping system between fuel supply and heater.

Locate sediment trap where trapped matter is not

likely to freeze. A sediment trap traps moisture and

contaminants. This keeps them from going into

heater controls. If sediment trap is not installed or is

installed wrong, heater may not run properly.
IMPORTANT:

Hold pressure regulator with

wrench when connecting it to gas piping and/or

fittings. Do not over tighten pipe connection to

regulator. The regulator body could be damaged.

INSTALLATION

Continued

Propane/LP
Supply Tank

Figure 12 - External Regulator With Vent

Pointing Down (propane/LP systems

only)

External
Regulator

Vent
Pointing
Down

Figure 13 - Gas Connection

* A CSA design-certified equipment shutoff valve

with 1/8" NPT tap is an acceptable alternative to

test gauge connection. Purchase the optional CSA

design-certified equipment shutoff valve from your

dealer. See Accessories, page 27.

Tee Joint

Reducer

Bushing to

1/8" NPT
1/8" NPT

Plug Tap

Tee

Joint

Pipe

Nipple

Cap

3/8"
NPT
Pipe
Nipple

Ground
Joint
Union

3"

Min

Natural Gas
From Gas Meter
(4" W.C. to 10.5" W.C.
Pressure [See
Specifications, page 26])
Propane/LP
From External Regulator
(11" W.C. to 14" W.C.
Pressure)

Equipment
Shutoff
Valve*

Test Gauge Connection*

Pressure
Regulator

Heater
Cabinet

Sediment
Trap

Advertising