Cleaning and inspection schedule – Hypertherm HPR800XD Auto Gas Preventive Maintenance Program Rev.1 User Manual

Page 10

Advertising
background image

10

HPR800XD Auto Gas Instruction Manual 808680

Preventive Maintenance Program

Cleaning and inspection schedule

This is a daily, weekly, and monthly schedule for cleaning and inspections. The PMP has instructions for each task. These
instructions help your personnel understand what to do and what to look for during each task. In general, an operator can
do the daily and weekly tasks, while maintenance personnel usually do the monthly tasks.

A monthly maintenance log is in the back of this manual. You can make photocopies of the maintenance log to record
tasks.

Table 1

Maintenance task or activity

Daily

Weekly

Monthly

Do a test of the inlet pressures

X

Examine all of the air filters

X

Do a check of the coolant level and condition

X

Examine and lubricate O-rings

X

Examine the water tube and torch

X

Examine hoses and torch leads

X

Do tests for gas leaks

X

Do a check of the coolant flow

X

Do a check of the coolant level

X

Clean inside the power supply

X

Clean the chiller air filter

X

Clean inside the chiller

X

Examine the coolant system

X

Examine the main contactor

X

Examine the pilot arc relay

X

Do the coolant flow test

X

Examine the gas line connections

X

Examine the hoses

X

Examine the cables

X

Examine the ground connections

X

Examine the table-to-workpiece connection

X