Mount the voltage divider to max200 b-2, Installation - max200, Thc-2 torch height control – Hypertherm THC2 Torch Height Control User Manual

Page 18: Mount the voltage divider to max200

Advertising
background image

Page 1b-2

THC-2 Torch Height Control

INSTALLATION - MAX200

MOUNT THE VOLTAGE DIVIDER TO MAX200

Be sure to complete all steps in Section 1: Installation - To Cutting Machine & Torch Lifter -

in addition to the following procedure for hooking the THC-2 to the MAX200.

1.

Remove top panel and both left and right side panels of the MAX200.

2.

Remove voltage divider template from the last page of this manual and punch out the
four mounting holes. Check dimensions as provided on template.

3.

Place template approximately as shown in Figure 1b-1.

4.

Mark the hole locations with a pencil and remove template.

5.

Protect the base of the MAX200 (especially the transformer) with a cloth, and drill the
four holes using a #29 drill bit.

6.

Unscrew the 4 screws from the voltage divider.

7.

Mount the voltage divider as shown in Figure 1b-2 with the white wire facing down.
Screw the voltage divider in place from the center wall right rear side (see Figure 1b-1).

8.

Carefully remove protective cloth and blow out any metal shavings inside of MAX200
power supply with shop or compressed air.

WARNING!

The line disconnect switch for the MAX200 must be in the

OFF

position

before proceeding with the installation of the voltage divider and interconnect

cable.

Advertising