Mount the voltage divider to pac-500 c-2, Figure 1c-1, Installation - pac-500 – Hypertherm THC2 Torch Height Control User Manual
Page 23: Thc-2 torch height control, Mount the voltage divider to pac-500

Page 1c-2
THC-2 Torch Height Control
INSTALLATION - PAC-500
MOUNT THE VOLTAGE DIVIDER TO PAC-500
Be sure to complete all steps in Section 1: Installation - To Cutting Machine & Torch Lifter -
in addition to the following procedure for hooking the THC-2 to the PAC-500.
Figure 1c-1 PAC-500 Plasma Control Console Plumbing Compartment
Approximate location
of Voltage Divider
34
1.
Open the left door of the PAC-500 plasma control console (plumbing compartment) and
place the voltage divider on the floor of the console - Fig. 1c-1.
2.
Attach the white wire from the voltage divider to terminal 34 located on the cathode block
- Fig. 1c-1.
WARNING!
The line disconnect switch for the PAC-500 must be in the
OFF
position
before proceeding with the installation of the voltage divider and interconnect
cable.