Mount the voltage divider to pac-500 c-2, Figure 1c-1, Installation - pac-500 – Hypertherm THC2 Torch Height Control User Manual

Page 23: Thc-2 torch height control, Mount the voltage divider to pac-500

Advertising
background image

Page 1c-2

THC-2 Torch Height Control

INSTALLATION - PAC-500

MOUNT THE VOLTAGE DIVIDER TO PAC-500

Be sure to complete all steps in Section 1: Installation - To Cutting Machine & Torch Lifter -
in addition to the following procedure for hooking the THC-2 to the PAC-500.

Figure 1c-1 PAC-500 Plasma Control Console Plumbing Compartment

Approximate location
of Voltage Divider

34

1.

Open the left door of the PAC-500 plasma control console (plumbing compartment) and
place the voltage divider on the floor of the console - Fig. 1c-1.

2.

Attach the white wire from the voltage divider to terminal 34 located on the cathode block
- Fig. 1c-1.

WARNING!

The line disconnect switch for the PAC-500 must be in the

OFF

position

before proceeding with the installation of the voltage divider and interconnect

cable.

Advertising