Figure 1c-3, Installation - pac-500, Thc-2 torch height control – Hypertherm THC2 Torch Height Control User Manual

Page 25: Page 1c-4

Advertising
background image

Page 1c-4

THC-2 Torch Height Control

INSTALLATION - PAC-500

5.

Make the following connections to 1TB located on the console door of the PAC-500, or
on the inside of the PAC-500L - Fig. 1c-3:

Cable wire labeled 1

to

1TB terminal labeled 3

Cable wire labeled 2

to

1TB terminal labeled 2

Cable wire labeled 3

to

1TB terminal labeled 26

Cable wire labeled 4

to

1TB terminal labeled 27

Figure 1c-3 PAC-500/500L Plasma Control Consoles - 1TB Location

1TB

2

1

26 27

3

4

26 27

2 2 3

1

1TB

PAC-500L

PAC-500

26 27

2 2 3

2 2 3

4

3

2

Advertising