Figure 1c-3, Installation - pac-500, Thc-2 torch height control – Hypertherm THC2 Torch Height Control User Manual
Page 25: Page 1c-4
Advertising
Page 1c-4
THC-2 Torch Height Control
INSTALLATION - PAC-500
5.
Make the following connections to 1TB located on the console door of the PAC-500, or
on the inside of the PAC-500L - Fig. 1c-3:
Cable wire labeled 1
to
1TB terminal labeled 3
Cable wire labeled 2
to
1TB terminal labeled 2
Cable wire labeled 3
to
1TB terminal labeled 26
Cable wire labeled 4
to
1TB terminal labeled 27
Figure 1c-3 PAC-500/500L Plasma Control Consoles - 1TB Location
1TB
2
1
26 27
3
4
26 27
2 2 3
1
1TB
PAC-500L
PAC-500
26 27
2 2 3
2 2 3
4
3
2
Advertising