Firing parameters – Ivoclar Vivadent IPS e.max CAD Flow Chart 3-unit bridge User Manual

Page 6

Advertising
background image

Cut-back technique using

IPS e.max Ceram

Cut-back technique using

IPS e.max Ceram

Finish the full-contour portion of the

IPS e.max CAD bridge using diamond

grinders and create a natural shape and

surface texture. (For details on the fabrication

of dies using IPS Natural Die Material see

"IPS e.max CAD labside").

Remove adhering IPS Object Fix residue by

immersing the restoration in an ultrasonic

cleaning bath or using a steam

cleaner. Do not blast the restoration with

Al

2

O

3

or glass polishing beads.

Place the firing tray in the furnace and

conduct the incisal firing cycle with the

respective parameters.

Complete the anatomical shape using

IPS e.max Ceram Incisal und Transpa

materials. Do not veneer or separate

the connectors.

Place the firing tray in the furnace and start

the stain/glaze firing cycle with the

respective parameters.

Apply IPS e.max Ceram Glaze to the

entire bridge. If desired, apply individual

characterizations using IPS e.max Ceram

Shades and Essences.

Apply IPS e.max Ceram Glaze to the

entire bridge and apply individual character-

izations using IPS e.max Ceram Shades

and Essences.

Bridge after incisal firing

Completed IPS e.max CAD LT bridge

Remove any residue by immersing the

restoration in an ultrasonic cleaning bath or

using a steam cleaner.

The wash (foundation) must be fired before

the actual layering procedure is started.

Place the honey-combed firing tray in the

furnace and conduct the wash (founda-

tion) firing cycle with the respective

parameters.

Finish the veneered areas using diamond

grinders and create a natural shape and

surface texture.

Firing parameters

Furnaces

IPS e.max Ceram on IPS e.max CAD

Cut-back technique

Stand-by

temperature

B

[°C/°F]

Closing time

S

[min]

Heating rate

t

1

[°C/°F/min]

Firing

temperature

T

1

[°C/°F]

Holding time

H

1

[min]

Vacuum 1

1

1

[°C/°F]

Vacuum 2

2

1

[°C/°F]

Long-term

cooling

L

[°C/°F]

Cooling rate

t

l

[°C/°F/min]

Programat
P300
P500
P700

Wash firing (foundation)

403/757

4:00

50/90

750/1382

1:00

450/842 749/1380

0

0

Incisal firing

403/757

4:00

50/90

750/1382

1:00

450/842 749/1380

0

0

Stain/glaze firing

403/757

6:00

60/108

725/1337

1:00

450/842 724/1335

0

0

Add-On with glaze firing

403/757

6:00

60/108

725/1337

1:00

450/842 724/1335

0

0

Add-On after glaze firing

403/757

6:00

50/90

700/1292

1:00

450/842 699/1290

0

0

Note

Cooling after firing

– Remove IPS e.max CAD objects from the furnace after completion of the firing cycle (wait for the acoustic signal of the furnace).

– Allow the objects to cool to room temperature in a place protected from draft.

– Do not touch the hot objects with metal tongs.

– Do not blast or quench the objects.

Wash firing (foundation)

Incisal firing

Stain and glaze firing

Advertising