7 operation, 1 front panel -{} status monitoring, 2 firmware upgrade – Nevion ETH1000-SW-COM User Manual

Page 17: Operation, 1 front panel - status monitoring, D1 d2 d3 d4

Advertising
background image

Operation

17

ETH1000-SW-COM Manual Rev. B

7 Operation

7.1 Front panel - status monitoring

There are 4 LEDs on the front side of the card, see

Figure 7.1

.

+

O

N

1

8

D1

D2

D3

D4

Figure 7.1 Location of the LEDs

Table 7.1

shows what the LEDs are indicateing in normal operation.

Table 7.2

shows some special

modes.

Table 7.1 LED statuses in normal operation

Red LED

Yellow LED

Green LED

No light

D1 Card status

Card error

Not applicable Overall status of the card is

OK

Card has no power, or is not
inserted correctly

D2 Status on GBE1

Link, 10 Mb/s Link, 100 Mb/s Link, 1 Gb/s

No link

D3 Status on GBE2

Link, 10 Mb/s Link, 100 Mb/s Link, 1 Gb/s

No link

D4 Status on GBE OPT Not applicable Not applicable Link, 1 Gb/s

No link

7.2 Firmware upgrade

ETH1000-SW-COM can be upgraded as any other Flashlink card using Multicon GYDA. It will

send the data over the management bus and will take aproximately one hour. During this time, the

card will function as normal. When the upgrade is completed, the card will reboot automatically.
ETH1000-SW-COM contains a web server that also can be used for firmware upgrade. If you have

a PC with a web browser on the same network as ETH1000-SW-COM, this is a good alternative.

Advertising