1 aes direction/destination selection, Aes direction/destination selection – Nevion AV-3G-XMUX User Manual

Page 18

Advertising
background image

Configuration

18

AV-3G-XMUX User Manual Rev. B

6.1.1 AES direction/destination selection

The 1st switch in each set of 4 controls two things:

1. The direction for 2 AES ports

2. The routing destination for the 3 switches.

Up or on means:

• The AES ports are inputs.

• The routing selects the source for an embedder group.

Down or off means:

• That the AES ports are outputs.

• The routing selects the source for AES outputs.

For Example: When SW1 switch 1 is ON:

• The module will embed into group 1 and AES 1&2 are inputs.

• The next three switches 2, 3 and 4 control which source will be embedded into group 1.

If SW1 switch 1 is OFF:

• The module will NOT embed group 1 and AES 1&2 are outputs.

• The next three switches 2, 3 and 4 control which source will be routed to AES outputs

1&2.

This pattern applies to all the switches of SW1 and SW2.

Table 6.1 SW1

1

2-4 route to

5

6-8 route to

ON

Emb Group 1

ON

Emb Group 2

OFF

AES 1&2

OFF

AES 3&4

Table 6.2 SW2

1

2-4 route to

5

6-8 route to

ON

Emb Group 3

ON

Emb Group 4

OFF

AES 5&6

OFF

AES 7&8

Switches 1 and 5 control two things. The tables show how they effect the next two switches

Advertising