Step 2: prepare the accessories, Installation guide – ACTi Bullet Camera (E44~E46) on Tilted Wall with Integrated Bracket User Manual

Page 17

Advertising
background image

www.acti.com

Installation Guide

17

Step 2: Prepare the Accessories

1.

Prepare the Conduit Gland accessories (included in the waterproof cable kit) and flexible

conduit cable (not included), with ½” trade size.

2.

Detach the parts of the main body, as follows:

NOTE:

The Lock Nut is designed for use with junction boxes and will not be used in this

installation. Please set it aside.

Clamping Nut

Sealing Insert

Body

Lock Nut

2-Sided Female
Type Connector

Converter

Washer

Main Body

Trade size 1/2"

Advertising