Installation instructions, Installation and commissioning instructions, Power supply connections – Eneo PXD-2080MIR D User Manual

Page 13

Advertising
background image

Installation Instructions

13

MEGA-PIXEL NETWORK CAMERA

Installation and commissioning Instructions

• Make sure the power is removed before the installation.

• After all connections are finished properly, follow the order for applying power.

a) Plug the network cable into RJ-45 Ethernet Port.

If PoE is the unique power, there will be no need to connect Power terminal.

b) When DC12V or AC24V Local power is necessary, connect the low voltage

(DC12V or AC24V) first, then plug the AC adapter to AC outlets to avoid an

improper reset from power jitter and a damage from the surge voltage when

no load.

Power Supply Connections

Camera can work with either 24VAC or 12VDC, dual voltage power and PoE

(IEEE Std. 802.3af). Primary and secondary grounds are completely isolated

to avoid the possible ground loop problems.

~24V/DC12V (RED)
~24V/GND (BLACK)
ALARM-IN (GREEN)
ALARM-OUT (BLUE)
GND (GRAY)
AUDIO-IN (BROWN)
GND (GRAY)
AUDIO-OUT (ORANGE)

■ Using EMI Ferrite Core

- Use to make a cable length short.

- Do not use the camera power cable, it could be not

assembled to a surface mount.

■ Attach the Signal Assignment Sticker
in a visible spot for wiring reference.

► When PoE and Local dual power are connected at the same time,

Local power has priority.

Advertising
This manual is related to the following products: