3  Power-Generating Unit Protection Test

SMA Solar Technology AG

14

SCCPXT_EZE-SG-en-11

Instructions for the Protection Test of the Power-Generating Unit

Requirements:

☐ The relevant test parameters have been saved (see Section 3.3, page 11).
☐ The tap changer setting on the MV transformer complies with the specifications of the grid operator or the PV system

certificate.

☐ The parameter settings comply with the specifications of the grid operator or the PV system certificate.

Procedure:

2. Identify the measurement and disconnect terminal using the circuit diagram and reference designation.
3. Connect the outputs L1, L2 and L3 of the testing device to the

measurement inputs P1, P2 and P3 on the measurement and

disconnect terminals of the voltage meter.

4. Connect the testing device's binary input to the measurement inputs P5 and P6 on the voltage meter's measurement

and disconnect terminals.

5. Connect the testing device to the external voltage supply.
6. Connect the laptop to the service interface.
7. Log into the user interface as an installer.
8. Conduct power generation unit protection test in accordance with TR8 data request form. Set the test parameters in

accordance with the specifications of the grid operator or the PV system certificate (see Section 3.3.1 "Overview of

Test Parameters", page 11).

– Voltage increase protection V> / t

V>

with the parameters VCtlhLim and VCtlhLimTm

– Voltage increase protection V>> / t

V>>

with the parameters VCtlhhLim and VCtlhhLimTm

– Voltage drop protection V< / t

V<

with the parameters VCtllLim and VCtllLimTm

– Voltage drop protection V<< / t

V<<

with the parameters VCtlllLim and VCtlllLimTm

– Frequency increase protection f> / t

V>

with the parameters HzCtlhLim and HzCtlhLimTm

– Frequency drop protection f<< / t

V<<

with the parameters HzCtllLim and HzCtllLimTm

9. Remove measurement cables from measurement and disconnect terminals.

10. Mount the panels.
11. Recommission the inverter (see installation manual).

1.

'$1*(5

Danger to life from electric shock due to live voltage

• Disconnect the inverter (see Section 3.4, page 12).
• After disconnecting the inverter, wait at least 15 minutes until its capacitors have discharged completely.