Table 3 liebert fpc heat output, Figure 3, Table 3 – Emerson Liebert FPC User Manual

Page 10: Liebert fpc heat output, Table 3 .)

Advertising
background image

Installation Instructions

6

Figure 3

Recommended minimum service and ventilation clearances

NOTE
1. Service access is required at the front and rear.
2. Service access clearance dimensions: 36" (914mm) for units up to 150V to ground. 42"

(1067mm) for units over 150V to ground.

3. Service access is required on the left side, if unit is equipped with Liebert Distribution

Monitoring Option.

Table 3

Liebert FPC heat output

Unit kVA

Full Load

Heat Output

BTU/Hr (kW)

15

2,500 (0.73)

30

4,600 (1.35)

50

6,200 (1.82)

75

8,150 (2.39)

100

9,900 (2.90)

125

11,500 (3.37)

150

12,500 (3.66)

200

15,500 (4.54)

225

15,800 (4.63)

300

18,450 (5.40)

Minimum clearance
of 6" (152mm) below
unit is recommended
for cable entry and exit

Minimum clearance
of 18" (457mm)
above unit is
recommended for
cooling airflow

Front and rear access

is required. See

Notes 1 and 2.

See Notes 2

and 3.

Advertising