Initial installation – Enviro Cara User Manual

Page 26

Advertising
background image

Figure 42: Cathedral Ceiling Support Box

Installation.

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 43: Corner installation rear vented with

snorkel.

Figure 44: Corner installation top vented.

c

orner

i

nstallations

:

Do not interfere with the structural integrity of the walls.
For installations with a 36” (915 mm) snorkel refer to Figure 43 and I

nItIal

I

nstallatIon

- V

ent

C

onfIguratIons

and

r

estrICtor

s

ettIngs

. For other corner installations refer to Figure 44 and I

nItIal

I

nstallatIon

- V

ent

C

onfIguratIons

and

r

estrICtor

s

ettIngs

.

Also refer to I

nItIal

I

nstallatIon

- C

learanCes

to

C

ombustIbles

.

5. Using tin snips, cut the “Support Box” from the top corners

down to the roof line, and fold the resulting flaps over the

roof sheathing (Figure 42). Before nailing it in to the roof,

run a bead of non-hardening mastic around the top edges

of the “Support Box”, to make a seal between the box and

the roof. Clean out any combustible material from the

inside of the “Support Box”.

6. Complete the cathedral ceiling installation by following the

same procedures outlined in Steps 4 through 9 for I

nItIal

I

nstallatIon

- V

ertICal

I

nstallatIon

.

26

Advertising