Initial installation – Enviro Cara User Manual

Page 28

Advertising
background image

Initial Installation

QUALIFIED INSTALLERS ONLY

i

nstallation

of

t

op

V

ented

; h

orizontal

t

ermination

:

Figure 47: Installation for Top Vented;

Horizontal Termination.

i

nstallation

of

t

op

V

ented

; V

ertical

t

ermination

:

Figure 48: Installation for Top Vented;

Vertical Termination.

This is the most common type of installation style.
Set the unit in place.
Install a minimum 24” (61cm), although 36” (91.5cm) or

more vertical vent length recommended.
Install a 90° elbow, and mark the exterior wall where the

vent would pass through.
Cut a 10” (25.4 cm) minimum hole in the wall to maintain

clearances to combustibles around vent pipe. Frame the

hole as shown in Figure 32.
Install wall thimble, interior finished collar, the vent section

through the wall, and then install the vent termination.
Seal around the termination using a non-hardening mastic.
Also refer to I

nItIal

I

nstallatIon

- V

ent

C

onfIguratIons

and

r

estrICtor

s

ettIngs

and I

nItIal

I

nstallatIon

- H

orIzontal

I

nstallatIon

.

Place the unit in place.
Drop a plumb bob from the ceiling to the center point of the

flue outlet.
Cut a 10” (25.4 cm) hole in the ceiling and the roof. Refer

to Figure 36.
Install the ceiling support and insulation guard.
Install the roof flashing. Ensure that the roof flashing is

installed under the roofing material so that a watertight

seal is created.
Install the flue pipe from the top of the unit through the

roof.
Ensure that all flue pipe and unit maintain required

clearances to combustibles.
Also refer to I

nItIal

I

nstallatIon

- V

ent

C

onfIguratIons

and

r

estrICtor

s

ettIngs

and I

nItIal

I

nstallatIon

- V

ertICal

I

nstallatIon

.

28

Advertising