Kichler 43566 User Manual

Kichler Lighting

Advertising
background image

1) Pass fixture wire from coupling on top of socket cluster

through end of long threaded pipe. Thread end of long

threaded pipe into coupling.

2) Pass fixture wire through long tube. Lower long tube down

over long threaded pipe.

3) Pass fixture wire through hole in coupling. Thread coupling

onto end of threaded pipe protruding from long tube.

4) Pass wire from coupling through stem. Thread end of stem into
coupling

NOTE: Thread locking compound must be applied

to all stem threads as noted with symbol (3) to prevent

accidental rotation of fixture during cleaning, relamping, etc.

5) Pass fixture wire through remaining stems and screw stems
together.
6) Thread one small threaded pipe into end of each small loop.
7) Pass fixture wire through first loop. Thread first loop onto

end of last stem.

8) Pass fixture wire through second loop and through hole in
canopy.
9) Pass threaded pipe at end of second loop through hole in
canopy.
10) Pass fixture wire through hole in lockwasher. Thread

lockwasher onto end of threaded pipe protruding from

inside canopy.

11) Pass fixture wire through hole in hexnut. Thread hexnut onto

end of threaded pipe.

12) Attach chain link to small loop at end of stem and to loop on
canopy.
13) TURN OFF POWER.

IMPORTANT: Before you start, NEVER attempt any work

without shutting off the electricity until the work is done.

a) Go to the main fuse, or circuit breaker, box in your

home. Place the main power switch in the “OFF”

position.

b) Unscrew the fuse(s), or switch “OFF” the circuit breaker

switch(s), that control the power to the fixture or room

that you are working on.

c) Place the wall switch in the “OFF” position. If the fixture

to be replaced has a switch or pull chain, place those in

the “OFF” position.

14) Find the appropriate threaded holes on mounting strap.

Assemble mounting screws into threaded holes.

15) Attach mounting strap to outlet box. (Screws not provided).

Mounting strap can be adjusted to suit position of fixture.

16) Grounding instructions: (See Illus. A or B).

A) On fixtures where mounting strap is provided with a

hole and two raised dimples. Wrap ground wire from

outlet box around green ground screw, and thread into

hole.

B) On fixtures where a cupped washer is provided. Attach

ground wire from outlet box under cupped washer and

green ground screw, and thread into mounting strap.

If fixture is provided with ground wire. Connect fixture

ground wire to outlet box ground wire with wire connector

(not provided.) after following the above steps. Never

connect ground wire to black or white power supply wires.

17) Make wire connections (connectors not provided). Reference

chart below for correct connections and wire accordingly.

MOUNTING STRAP

ABRAZADERA DE MONTAJE

CANOPY

ESCUDETE

Date Issued: 10/3/14

IS-43566-US

GREEN GROUND

SCREW

CUPPED

WASHER

A

B

OUTLET BOX

GROUND

FIXTURE

GROUND

DIMPLES

WIRE CONNECTOR

(NOT PROVIDED)

OUTLET BOX

GROUND

GREEN GROUND

SCREW

FIXTURE

GROUND

SEE OTHER SIDE FOR SPANISH TRANSLATIONS.
VEA EL OTRO LADO DE TRADUCCIONES AL ESPAÑOL.

KNURL KNOB

PERILLA ESTRADA

3

SMALL LOOP

ARGOLLA PEQUEÑA

3

CHAIN LINK

ESLABÓN DE CADENA

STEM

VASTAGO

We’re here to help

866-558-5706

Hrs: M-F 9am to 5pm EST

Connect Black or

Red Supply Wire to:

Connect

White Supply Wire to:

Black

White

*Parallel cord (round & smooth)

*Parallel cord (square & ridged)

Clear, Brown, Gold or Black

without tracer

Clear, Brown, Gold or Black

with tracer

Insulated wire (other than green)

with copper conductor

Insulated wire (other than green)

with silver conductor

*Note: When parallel wires (SPT I & SPT II)
are used. The neutral wire is square shaped
or ridged and the other wire will be round in
shape or smooth (see illus.)

Neutral Wire

18) Push fixture to ceiling, carefully passing mounting screws

through holes in canopy.

19) Thread knurl knobs onto mounting screws. Tighten knurl

knobs to secure fixture to ceiling.

20) Unscrew ball studs holding retaining plates in place above

socket cluster. Remove both retaining plates.

21) Lower one half of top glass diffuser down onto bracket in

center of fixture above socket cluster.

22) Set one retaining plate on top of top glass diffuser. Align

holes in retaining plate with holes in top glass diffuser.

23) Thread end of one ball stud into hole in retaining plate and

into top glass diffuser. Carefully tighten ball stud to secure

retaining plate and top glass diffuser in place. (DO NOT over

tighten.)
24) Repeat steps 21-23 for remaining top glass diffuser and

retaining plate.

25) Thread end of threaded pipe with hexnut into hole in bottom

of socket cluster.

26) Screw hexnut onto end of threaded pipe.
27) Raise shade up to fixture. Fit shade over socket cluster.
28) Raise glass diffuser up to fixture. Pass hole in glass diffuser

over end of threaded pipe. Fit glass diffuser up against

bracket on bottom of shade.

29) Pass hole in rubber washer over end of threaded pipe

protruding from bottom of glass. Pass hole in flat washer

over end of threaded pipe. (DO NOT over tighten.)

30) Thread hexnut onto end of threaded pipe.
31) Pass hole in bottom trim over end of threaded pipe. Thread

finial onto end of threaded pipe. (DO NOT over tighten.)

32) Attach large crystal to loop in center of fixture body.
33) Attach small crystal to loop on bottom of finial.

SOCKET CLUSTER

GRUPO DEL PORTALÁMPARAS

THREADED PIPE

TUBO ROSCADO

HEXNUT

TUERCA HEXAGONAL

FLAT WASHER

ARANDELA PLANA

RUBBER WASHER

ARANDELA DE CAUCHO

FLAT WASHER

ARANDELA PLANA

RUBBER WASHER

ARANDELA DE CAUCHO

HEXNUT

TUERCA HEXAGONAL

FINIAL

CAPUCHON

SHADE

PANTALLA

BOTTOM GLASS DIFFUSER

DIFUSOR VIDRIO

SMALL CRYSTAL

CRISTAL PEQUEÑA

BOTTOM TRIM

GUARNICIÓN

INFERIOR

LARGE CRYSTAL

CRISTAL GRANDE

BALL STUD

PERNO ESFÉRICO

PARA RÓTULA

FIXTURE BODY

CUERPO DEL ARTEFACTO

RETAINING PLATE

PLACA DE RETENCIÓN

TOP GLASS DIFFUSER

DIFUSOR VIDRIO

Advertising