Prepare for use, General inspection – RIGOL DSA1030 User Manual

Page 28

Advertising
background image

RIGOL

14

Quick Guide for DSA1000 Series

Prepare for Use

General Inspection

Please inspect your new analyzer according to the following steps:

1. Inspect the shipping container for damage

Keep the damaged shipping container or cushioning material until the
contents of the shipment have been checked for completeness and the
instrument has passed both electrical and mechanical tests.

The consigner or carrier shall be liable for the damage to instrument

resulting from shipment.

RIGOL would not be responsible for free

maintenance/rework or replacement of the unit.


2. Inspect the instrument

In case of any damage, or defect, or failure, notify your

RIGOL Sales

Representative.


3. Check the accessories

The accessories supplied with the instrument are listed as follows. If your
contents are incomplete or damaged, please notify your

RIGOL Sales

Representative.








Advertising