Installation – Enviro WINDSOR 50-1578 User Manual

Page 18

Advertising
background image

TO SUPPLY POWER TO THE EXHAUST BLOWER:
Install an amour coated electrical cable from the exhaust blower housing, through the wall thimble, and

attach to the pre-drilled hole in the left hand rear hopper pillar. Hook up to wires from the wiring harness

for the exhaust blower. All electrical connections must be in accordance with local code requirements (see

W

IRING

D

IAGRAM

).

Installation

Vent termination cap

(stainless steel termination

hood) or 45° elbow with

rodent screen

90° elbow

Wall strap

(recommended with

use of vent pipe)

Exterior blower

and housing

Vent pipe or 610mm

(2 foot) riser

Pipe adapter (if using riser)

Wall framing

Wall thimble

Horizontal frame

for thimble

Armour cable supplying

power to exterior blower

Siding

Figure 19: Exhaust Blower Installation; Horizontal Termination.

9. Connect the wires in the stove. Re-install the left side access cover to the stove and the back grill on

the exterior vent housing.

10. Set the Slider Damper as described in the I

NSTALLATION

- S

LIDER

/D

AMPER

S

ETTING

“ section.

NOTE:
Ensure that all vent connections are installed by placing three (3) screws evenly spaced and a small bead

of high temperature silicone at each chimney connection. Also ensure that all vertical vent sections are

properly supported and that all clearances to combustibles are maintained in accordance with the vent

manufacturer’s specifications.

18

Advertising