Installation – Enviro WINDSOR 50-1578 User Manual

Page 19

Advertising
background image

19

Storm Collar

Roof Flashing

Roof Rafters

Roof Sheathing

Ceiling Joist

Vertical Vent Pipe

Outside Vent

Termination

Exterior Wall

Sheathing

Rain cap - ensure

cap is at least

900mm (3 ft)

above the roof at

the lowest point

Installation

T

HROUGH

W

ALL

V

ERTICAL

I

NSTALLATION

W

ITH

E

XHAUST

B

LOWER

:

Refer to I

NSTALLATION

- I

NSTALLATION

WITH

E

XTERIOR

M

OUNTED

E

XHAUST

B

LOWER

and I

NSTALLATION

- O

UTSIDE

V

ERTICAL

I

NSTALLATIONS

. Ensure that vent pipe is properly secured to wall using wall straps. Maintain clearances to

combustibles on vent pipe as well as unit.

Figure 20: Exhaust Blower Installation; Vertical Termination.

Advertising