For vertical terminations – Hearth and Home Technologies Everest User Manual

Page 21

Advertising
background image

Heat & Glo • Everest • 750-900 Rev. o • 10/08

21

For Vertical Terminations

- To locate the vent and

install the vent sections:

• Locate and mark the vent centerpoint on the underside

of the roof, and drive a nail through the centerpoint.

• Make the outline of the roof hole around the centerpoint

nail.

• The size of the roof hole framing dimensions depend on

the pitch of the roof. There MUST BE a 1-inch (25.4mm)
clearance from the vertical vent pipe to combustible
materials.

• Mark the roof hole accordingly.

• Cover the opening of the installed vent pipes.

• Cut and frame the roof hole.

• Use framing lumber the same size as the roof rafters

and install the frame securely. Flashing anchored to the
frame must withstand heavy winds.

• Continue to install concentric vent sections up through

the roof hole (for inside vent installations) or up past the
roof line until you reach the appropriate distance above
the roof (for outside terminations).

!

Figure 19. Minimum Height from Roof to Lowest

Discharge Opening

To seal the roof hole, and to divert rain and snow from the
vent system:

• Attach a fl ashing to the roof using nails, and use a non-

hardening mastic around the edges of the fl ashing base
where it meets the roof.

• Attach a storm collar over the fl ashing joint to form a

water-tight seal. Place non-hardening mastic around the
joint, between the storm collar and the vertical pipe.

• Slide the termination cap over the end of the vent pipe

and snap into place.

NOTE: This also pertains to vertical vent systems
installed on the outside of the building.

WARNING: MAJOR U.S. BUILDING CODES
SPECIFY MINIMUM CHIMNEY AND/OR VENT
HEIGHT ABOVE THE ROOF TOP. THESE
MINIMUM HEIGHTS ARE NECESSARY IN
THE INTEREST OF SAFETY. SEE THE FOL-
LOWING DIAGRAM FOR MINIMUM HEIGHTS,
PROVIDED THE TERMINATION CAP IS AT
LEAST TWENTY INCHES FROM A VERTICAL
WALL AND 2-FEET BELOW A HORIZONTAL
OVERHANG.

Roof Pitch

H (Min.) Ft.

Flat to 6/12...........................................1.0
Over 6/12 to 7/12 .................................1.25
Over 7/12 to 8/12 .................................1.5*
Over 8/12 to 9/12 .................................2.0*
Over 9/12 to 10/12 ...............................2.5
Over 10/12 to 11/12 .............................3.25
Over 11/12 to 12/12 .............................4.0
Over 12/12 to 14/12 .............................5.0
Over 14/12 to 16/12 .............................6.0
Over 16/12 to 18/12 .............................7.0
Over 18/12 to 20/12 .............................7.5
Over 20/12 to 21/12 .............................8.0

HORIZONTAL

OVERHANG

VERTICAL

WALL

GAS DIRECT VENT
TERMINATION CAP

12

X

ROOF PITCH

IS X/ 12

LOWEST

DISCHARGE

OPENING

2 FT.

MIN.

20 INCHES MIN.

H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING

Advertising