G. Complete Installation

WARNING! Risk of Fire! You MUST maintain 2 in.
(51 mm) air space to insulation and other combustible ma-
terials around the chimney system. Failure to do so could
cause overheating and fi re.
• Keep chimney sections from separating or twisting.
• You may secure straight chimney sections at the joints

with screws no longer than 1/2 in. (13 mm).

Figure 8.9 Ceiling/Attic Construction

H. Install Flashing

• Slip

the

fl ashing over the chimney.

• Nail

the

fl ashing to the roof. Keep gaps between fl ashing

plate and roof to a minimum.

NOTICE:

Roofi ng shingles must be below the fl ashing

plate on the lower side of a sloped roof and over the
fl ashing plate on the sides and top.

• Caulk

the

fl ashing plate and roof junction as well as the

vertical seam on the fl ashing. All nail heads must be
caulked with a roofi ng sealant.

Heatilator • Birmingham BIR42 • 4059-308 Rev E • 08/08

F. Cut Out Hole in Roof

• Refer to Figure 8.9.
• Plumb from roof to center of chimney.
• Drive a nail up through roof to mark center of pipe.
• Measure to either side of nail and mark the 17 in. x 17 in.

(432 mm x 432 mm) opening required.

• Measure opening on the horizontal; actual length may be

larger depending on roof pitch.

• Cut out and frame opening.
• Refer

to

Chapter 25 of the Uniform Building Code for

roof framing details.