Heat & Glo • CFX-CRESCENT • 705-900 Rev. P • 12/07

17

B. Installing Vent Components

1. Attach the First Vent Component to the

Starting Collars

To attach the first vent component to the starting
collars of the fireplace:

• Apply a 3/8 inch (9.5 mm) bead of stove cement

around the 4 inch (102 mm) fireplace starting collar.

• Slide the first vent section onto the collars attached

to the top of the unit. Use four self tapping screws to
secure the outer pipe to the outer collar.

• Apply a 3/8 inch (9.5mm) bead of stove cement

around the 6 5/6 inch (168mm) outer collar.

1. Apply the stove

cement.

2. Line up the internal

beads and slide pipe
on. Note: Outer pipe
slides into outer (cone
shaped) collar 1/2 inch.

3. Fasten with four

screws.

4. Apply the stove

cement to outer collar
joint.

STARTING

COLLAR

STOVE

SEALANT

BEAD

1 INCH

(25.4mm)

FIRST VENT

COMPONENT

3/8” (9.5mm)

!

Figure 9. Attaching the First Vent Component to

the Starting Collars

WARNING: A 3/8 INCH (9.5 MM) BEAD
OF STOVE CEMENT MUST BE
PLACED AROUND THE 4 INCH (102
MM) FIREPLACE STARTING COLLAR
BEFORE ATTACHING THE FIRST VENT
COMPONENT. FAILURE TO SEAL THIS
JOINT MAY CAUSE THE FIREPLACE
TO OPERATE IMPROPERLY. SEE THE
DIAGRAM .