Figure 12. 10" x 10" Hole and Vent Pipe

2. Position the firestops.

3. Place the heat shield

to the top.

4. Continue the vent run.

Figure 13. Heat Shield, Interior and Exterior

Firestops

For Vertical Runs - One ceiling firestop is
REQUIRED at the hole in each ceiling through
which the vent passes.

To install firestops for vertical runs that pass through
ceilings:

• Position a plumb bob directly over the center of

the vertical vent component.

• Mark the ceiling to establish the centerpoint of the

vent.

• Position the firestops on both sides of the hole

previously cut and secure the firestops with nails
or screws.

• The heat shields of the firestops MUST BE

placed towards the top of the hole.

• Continue the vent run through the firestops.

NOTE: There must be NO insulation or other
combustibles inside the framed firestop opening.

1. Cut the 10-inch by

10-inch hole.

VENT PIPE

1" (25.4 mm)

10"

(254mm)

10"

(254mm)

TRIM HEAT
SHIELD IF TOO
LONG, ADD TO
SHIELD IF TOO
SHORT

INTERIOR

FIRESTOP

HEAT SHIELD

NOTE:
Exterior firestop not shown.
Horizontal termination only
approved for SLK-01TRD
trapezoidal cap.