Function tests setup – Genie AWP 114002 User Manual

Page 18

Advertising
background image

Operator’s Manual

Third Edition • Fourth Printing

16

Genie AWP Super Series

Part No. 114002

FUNCTION TESTS

Function Tests

Setup

1 Position the machine on a firm surface directly

below the desired work area.

2 Connect to the appropriate power source:

DC models: Connect the battery pack.
AC models: Connect to a grounded 15A AC
power supply. Use a 12 gauge / 3.3mm

2

3-wire

grounded extension cord no longer than
50 feet / 13 m.
Air models: Connect the air line.

3 Insert the key and turn to platform control.

4 Pull out the red Emergency Stop button to the

on position at the ground controls.

5 Twist to release the red Emergency Stop button

at the platform controls.

Result: AC & DC models: The power light should

come on.
Air models: The air pressure gauge should read
80-110 psi /5.5 - 7.8 bar.

6 Select an outrigger and

slide it into a base
socket until the
outrigger lock pin snaps
into place. Adjust the
outrigger to level the
machine and raise the
base casters slightly off
the ground. Level the
machine using only the
outriggers.

7 Check the interlock display

lights at the ground
controls. Confirm that the
corresponding light is on.

8 Repeat this procedure for each of the remaining

outriggers.

9 Use the bubble level and adjust the leveling

jacks until the machine base is level.

Test Emergency Stop

10 Push in the red Emergency Stop button at the

ground controls to the off position.

11 Push in the control activate button and rotate

the up/down switch in the direction of intended
travel.

Result: The up/down function should not

operate.

Advertising