Getting started, Specifications – GE A8950CC User Manual

Page 4

Advertising
background image

Overview

Installing the Phoenix chassis is a three-step process:

1. Install mounting hardware and power supplies.
2. Install modules and connect cabling.
3. Configure the system.

Determine Mounting Hardware

Mounting brackets are adjustable. Choose the best location to fit your application and
position brackets using the supplied hardware. Remove screws holding front mounting
bracket, move to top, bottom, back or front and refasten.

Installing Power Supplies

All installation should be from rear of rack unit.

To install power supply, slide power supply in slot "A" and secure with hardware. Remove
center support panel and use to cover open slot if redundant power supply is not used.

Optional Redundant Power Supply: When using the redundant power supply, remove panel
and insert second power supply in slot "B" and secure.

** CAUTION:

This product contains ESD-sensitive components. Although all precautions have been made to
reduce ESD susceptibility, use good grounding techniques when handling uninstalled modules

.

2

Getting Started

Specifications

Model

A8960AC

Size

Weight

Model

Part Number

Optional Redundant Power Supply

A8960AC

1.65 in. W x 3.30 in. H x 8.00 in. D (42 x 84 x 203 mm)

1.25 lb. (5.67 g)

Electrical
• Input power: 100 V to 240 V, 60 Hz

Input power: 105 V to 240 V, 50 Hz

• Current requirement: 2 A
• Power consumption: 40 W
• Protection: 250 V, 2 A fuse

Model

Slot B

Model

Part Number

Active fuse

Model

Part Number

Spare fuse

Model

Slot A.

Module Installation

The Optical Transceiver is the first module to be installed.

Advertising