Insert the main board – Matsushita CF-Y5LWVYZ 1 2 User Manual

Page 46

Advertising
background image

46

9.3.3.7. Insert the Main Board

1-3mm

2-4mm

Tape

Coin Battery

Edge side central distribution

Affixation
within this range

Safety Work

Safety Work

Safety Work

Screw
(DXQT2+D25FNL)

Screw
(DXQT2+D25FNL)

MODEM Preparation goods

W-LAN Module Preparation goods

Screw
(DXQT2+D25FNL)

Memory Spreader

Screw
(DXQT2+E6FNL)

Affixes to the sheet..Does not get on the board.

Valley case
Bend with 0.5 or more
(Use the treatment device)

The adsorption sheet of the
axis for fixation is peeled off
before installs. (2 places)

Safety Work

The adsorption sheet of the
axis for fixation is peeled off
before installs. (2 places)

After the pin by which the
position is decided is inserted, a
fixed screw is tightened.
After the screw is tightened, the
pin is detached.

Slit externals match

0-1.5mm

*Does not overlap in the slit

0 2mm

0 2mm

AL Sheet externals standard

Board Label

Character
direction (Upper)

MODEM LAN Holder

MODEM CN installation

LAN CN installation

Installs so that the cable should not cross.

Pressurizes with the battery the finger is
put in the PCMCIA slot.

(Attention)
-The board is set in the receiving treatment device and works.
-When carrying to the following process, a special palette is used.
(The FPC bend in YB respect is prohibited)

The cable is processed to this part remaining. Does
not get on a top side in the main body of the battery.

Fit to
connector
affixation

9.3.3.8. Note of Wireless LAN module is inserted

<Notes when Wireless LAN Module is inserted>

Please do Board’s insertion and extraction correctly according to the direction and the procedure shown in the figure below

Please go from parallel respect to mounting Board in Board’s insertion and extraction within the range of 5 -10
Please insert in the interior completely when you insert Board.

Advertising