Putting line hold sheet 3 / line hold cushion – Matsushita CF-Y5LWVYZ 1 2 User Manual

Page 69

Advertising
background image

69

9.3.6.4. Putting Line Hold Sheet 3 / Line Hold Cushion

< part A details >

< part B details >

< part C details >

< part D details >

< part E details >

0.5 or more

Put on the rib side
while pulling the
tape

Secure the space with
bossing the outer rib

Put on the rib side with
there not loosening

Push the tape and push the Cable by
processing as shown in the figure below

HDD protection slot

Make the rib
under slipped

Put on the rib side by pushing
so that running aground is not
on the boss heaven side

Put on the rib side by processing the
tape to lower more than the boss
heaven side while pushing

Put on the rib side
with there not
loosening

Be careful not to run aground on the boss
heaven side about wire rod fixation tape 3

A

B

C

0-2

2-5

MODEM Cable

LAN Cable

Prevent the cable from
running aground on the
boss heaven side

Prevent the cable from running
aground in boss heaven
side/bossing the outer rib.

Insert the MODEM
cable in the slit

0-1

0-1

Cushion for lead fixation

Pull out a MODEM cable just
beside in an HDD protection slot,
along the HDD protection slot, and
process the MODEM cable forward

D

E

Prevent the cable from
running aground on the
rib heaven side

Pass the under of the cushion
for the lead fixation through
LAN cable

Process the cable in the order
of A-E after positioning the
tube of LAN cable

Prevent the cable from
running aground on the
boss heaven side

LAN Cable (upper)

LAN Cable (upper)

MODEM Cable (lower)

MODEM Cable (lower)

Put wire rod fixation tape 3

wire rod fixation
tape 3

A

B

C

D

E

Put the cushion for the lead fixation

Directionality having
The back
Side without tape

Set the MODEM/LAN
holder in a lower cabinet

Safety work
(Content of this page)

Advertising