Assembly of the disk cover lock / sw pcb, Assembly of the disk cover click – Matsushita CF-Y5LWVYZ 1 2 User Manual

Page 56

Advertising
background image

56

9.3.4.10. Assembly of the Disk Cover Lock / SW PCB

< Preparation for Disk Cover Lock >

There is directionality.
R shape is matched.

The insertion
order : 2
The fingernail
is multiplied.

The insertion order : 1
Inserts in R shape part
and the slide in
the right side.

Disk Lock Bush installation

Safety work

The engagement fingernail is
the confirmation two places as
for there is not collapsing.

Hanging fee of fingernail = (0.2)

Hole externals of
Disc Cover Lock

Disc Cover Lock

Convex is on both sides.

Do not crush convex
of this when detaching.

< preparation for solenoid with lead >

Flaking off
paper

Solenoid Fix Tape (FAN/SP)

The same to width
of tape standard

Flaking off paper
leaving side

This side of
red lead

Affixes Solen Fix Tape (FAN/SP)

The half of the
flaking off paper
is put on the
peel cable.

Conclusion of
Screw(DXQT2+F2FNL)

Installation
Solenoid Angle

Solenoid with lead

9.3.4.9. Assembly of the Disk Cover Click

Conclusion Screw(DXHM0057ZA)

Affixes Water Cap Tape

Affixes Insulation Sheet

Water Cap installation

Disk Cover Click
installation

Do not hang the roller end face
in this part on the top case side.

Advertising