Mounting, Horizontal/rack, Vertical – MGE UPS Systems Switched PDU User Manual

Page 8: Attaching the expansion module, Connecting to the power source, Installation, Attac, Hing the expansion module, Con e power source, Necting to th

Advertising
background image

2. Installation

Mounting

Horizontal/Rack

e appropriate bracket mounting points

within the rack.

ts to these mounting points

Vertical

Figure 3. Mounting

1.

Attach the removable flanges to the mount

r of the enclosure using M4

.

1.

Select th
for proper mounting depth

2.

Attach the bracke
with two screws for each bracket.

3.

Install the enclosure into your rack, using the
slots in each bracket. The slots allow about ¼
inch of horizontal adaptability to align with the
mounting holes of your rack.

points on the rea
screws.

2.

Attach the mounting L-brackets to the flanges
with the supplied screws, washers and nut
plates. The slots allow about 1½ inches of
vertical adaptability.

3.

Attach the top and bottom brackets to your rack

Attac

C

nsion Module with the prov

hing the Expansion Module

onnect the Switched PDU Expa

ided RJ12 crossover cable at the at the Link port on

the Switched PDU.

NOTE: The overall length of the cable should not exceed 10 feet.

Con

e Power Source

en each outlet, eliminating a potential blown

ush current.

on bracket.

necting to th

Each outlet powers up sequentially, with a two-second delay betwe
primary fuse or circuit breaker from excessive in-r

To attach a power cord to the unit:

1.

Plug the female end of the power cord firmly into its connector at the base.

2.

Use a screwdriver to tighten the two screws on the retenti

To connect to the power source:

Plug the male end of the power cord into the AC power source.

Page 8 - 301-0399-4 Rev A.

Advertising