Removing Interior Stops, Liners and Fillers

Removing Ultimate Casement Stops and Covers

Some structural installations that use the “jamb pinning” method require the removal of interior stops before installing

the window. This section details the removal of Ultimate Double Hung (UDH) jamb liners and Ultimate Casement

operator and stationary stops.

Details for UDHM windows can be found in the supplemental instruction sent with the unit.

1. Sill and head jamb covers and stops are held in place

with a vinyl barb and can be easily removed by simply

and carefully prying up on the stop with a sharp putty

knife. Be careful not to damage the stop or frame. Oc-

casionally the barb will stay in the frame when you re-

move the stop. Remove the barb with a pair of pliers

and reinsert into the kerf on the stop/cover. See fig-

ure 17a.

NOTE: Stationary jamb stops are removed in the same

fashion. You will need to remove the head jamb and sill

covers first.

2. Operator jamb covers are held in place by two barbs:

one on the interior side and one on the exterior side

shared by the frame weather strip. With the sash

opened or removed, first pull the frame weather strip

out of the kerf and set aside for reuse later.

3. Remove the sill and head jamb stops.
4. With a sharp putty knife, carefully pry on the interior

side between the stop and the frame. Start at one end

and work your way down until stop loosens. See fig-

ure 17b.

Figure 17: Removing Ultimate Casement stops and covers.

Figure 18

(b)

(a)

Removing UDH Jamb Liners

1. Remove the head jamb parting stop with use of a pry

bar. See figure 18a.

2. Use a flat headed tool with a 90 degree elbow to re-

move the lower fillers from the jamb hardware assem-

bly. This is best done by placing the tool into the space

opened by the removed checkrail pad. Loosen both

corners of the jamb fillers from the notches before try-

ing to remove them, to reduce the possibility of damage

to the fillers. See figure 18b. Be sure to take care when

doing so, as there is a possibility of the fillers breaking.

3. From the exterior, pry out the jamb hardware assem-

bly using a pry bar by placing it into the bottom filler

channel, hooking it into the notches on the side, and

levering it out. See figure 18c.

4. When installation of the unit is complete, seat the

jamb assembly facing towards the exterior first, and

ease the remainder of the assembly into the jamb

pocket. See figures 18d and 18e. Use of a rubber

mallet may be required. If so, take the mallet and,

starting at one end, work your way up the filler, until

fully seated. (Use of a cloth to protect the wood and

keep it clear from direct impact while hammering is

suggested.)

5. Reinstall the checkrail pads and head jamb part stop.

Head jamb

parting stop

Bottom

filler

channel

SHOWN FROM

EXTERIOR

(b)

(a)

(d)

(c)

(e)

14

Window Installation

StormPlus and Structural Installations

19970019

2013−03−01