Step 3

: Installing the Window

Figure 6: Plumb and square unit. (Illustration shows both structural bracket and jamb screw installation.)

The following steps provide details for structural fastening of the window to the opening. When installing windows

with nailing fin or wood brick mould casing, it may be desirable to first attach the window using these fastening

methods in conjunction with steps 1−5. Then complete the installation by fastening with structural brackets or

screws. Always follow fastener spacing outlined in the “Jamb/Sill Screw Chart” section. On applicable construction

using a continuous air barrier system, prepare the opening before installing the window. Refer to the “Continuous

Air Barrier Systems” section for details.

1. If rigid sill pan is not used, pan sill with alternate meth-

ods or shim under window sill to ensure it does not

come in direct contact with treated lumber.

2. On some larger units such as the Ultimate Double

Hung Magnum, it may be necessary to remove the

sash prior to installation. See the sash removal sec-

tion for details.

3. Center the window in the opening. Level at the sill

and plumb the frame (interior/exterior) to desired

depth.

4. Fasten and shim the jambs at the bottom with the

appropriate fastener (follow instructions in the

“Fastening Methods” section). See figure 6a.

CAUTION: Proper shimming is extremely

important. Under−shimming or over−

shimming will result in bowed jambs and

Installation Tip: On operating units, one

method to ensure that the unit is installed

square is to check the reveal (gap) between the

operating sash and the frame. An even reveal around

the entire sash generally indicates a correctly

installed unit and will ensure smooth operation.

or head jamb. Both conditions can contribute to

improper window operation and performance.

(b)

(a)

Measure

diagonally

for square

Seek Assistance: Some large windows

and/or assemblies are very heavy. Avoid

injury by getting help to lift and position the

window into the rough opening.

(c)

5. Fasten and shim at the top corners to square the unit

in the opening. Take diagonal measurements of the

window. When equal, the window is square in the

opening. Adjust the shims and fasteners until the unit

is square in the opening. See figure 6b.

6. Complete shimming and fastening at locations and

spacing specified in the “Jamb/Sill Screw Chart”.

See figure 6c.

7. Recheck the diagonals one more time to make sure

the unit is square in the opening. Adjust fasteners as

necessary to bring to square.

8. Once the unit is installed square and plumb, operate

the sash (on operable units) to make sure it is operat-

ing properly. If not, you may have to make some addi-

tional adjustments to the shims and fasteners.

9. If removed, replace your stops, covers, and liners.

NOTE: Some units such as the Ultimate Double Hung

Magnum and IZ3 Ultimate Double Hung, feature unique

fastening systems. For these windows refer to the “Spe-

cial Fastening Systems” section for details.

7