Step 1, Rough opening and framing requirements – Marvin Window User Manual

Page 5

Advertising
background image

Step 1:

Rough Opening and Framing Requirements

Figure 1: Preparing openings for concrete block openings.

This section gives requirements for framing and rough opening clearances. Masonry or concrete openings must be

lined with a treated wood product (wood buck). You must fasten the buck to the masonry opening in a fashion that

will withstand conditions which would be encountered under the certified and advertised DP ratings for this window.

The structural integrity of this installation is only as good as the bond between the wood buck and the masonry

opening. For more details, contact your Marvin representative.

1. On concrete block, masonry, or similar situations, line

the sides, head jamb, and sill with treated lumber.

Attach the lumber to the masonry opening with

construction adhesive and masonry anchors which

should penetrate the masonry opening by at least

1,−1 1/2,

(25−38)

. See figure1a and 1b.

2. For standard wood frame construction, prepare the

opening following local codes, ASTM E2112−1, or fol-

low the steps in the “Continuous Air Barrier

Systems” section.

3. If rigid panning is used, place a bead of silicone or

construction adhesive over any fasteners used to

hold the panning to the sill.

(a)

NOTE: Wood buck material thickness may vary. Illustrations show a 1/2, plywood and 2 x 4 buck. Installations

using material less than 2, nominal material must use the jamb screw method of attachment and use 3/16, concrete

anchors.

Treated

2 x 4 buck

1/2, treated

plywood

Masonry

anchor

Construction

adhesive

NOTE: If your installation requires screwing through

the sill for structural purposes, place a bead of sealant

where the screws will penetrate the rigid sill panning.

4. The window frame must not come in contact with

treated lumber. If you will not be using rigid panning

or shimming at the sill, apply a barrier such as a self

sealing adhesive flashing to the rough opening sill.

See figure 1 c.

(b)

(c)

Adhesive

flashing

4

Window Installation

StormPlus and Structural Installations

19970019

2013−03−01

Advertising