Vent installation, Warning – Monessen Hearth 6000DV User Manual

Page 22

Advertising
background image

22

42D0200

HO

T

HOT

VENT INSTALLATION

4. Apply a bead of non-hardening mastic around the outside

edge of vent cap. Position the vent cap in the center of hole

on the exterior wall with the word “UP” on the vent cap

facing up. Insure proper clearance of 1" to combustibles

is maintained. Attach the vent cap with four wood screws

supplied. See Figure 22.

Do not recess vent termination
into any wall. This will cause a
fire hazard.

W

ARNING

NOTE: Replace the wood screws with appropriate
fasteners for stucco, brick, concrete, or other types
of siding.

For vinyl siding, stucco, or wood exterior use vinyl siding

standoffs between vent cap and exterior wall. The vinyl siding

standoff prevents excessive heat from melting the vinyl siding

material. Bolt the vent cap to the standoff. Apply non-harden-

ing mastic around outside edge of the standoff instead of the

vent cap assembly. Use wood screws provided to attach the

standoff. See Figure 23.
5. Slide fire stop over the vent pipe before connecting hori-

zontal run to vent cap. See Figure 24.

6. Insert vent pipe into the horizontal termination. The pipe

overlap should be a minimum of 1

1

/

4

". Fasten all vent

connections with screws provided.

7. Slide fire stop against the interior wall surface and attach

with srews. See Figure 24.

Figure 22 - Installing Horizontal Vent Cap

REAR WALL VENT INSTALLATION (continued)

Figure 23 - Installing Vinyl Siding Standoff

Apply

Mastic to

All Four

Sides

Vent Cap

Wood

Screw

Cut Vinyl Siding

Away to Fit Standoff

Wood Screw

Vent Cap

Bolt

Apply Mastic to

All Four Sides

Nut

Standoff

Figure 24 - Connecting Vent Cap with Horizontal

Vent Pipe

Interior Wall

Surface

Horizontal

Vent Pipe

Screw

Vent Cap

(Horizontal

Termination)

Deflecting Shield

Deflecting Shield

Advertising