Hardware implementation of the lufp7 gateway, On receipt, Introduction to the lufp7 gateway – Schneider Electric Gateway LUFP7 User Manual

Page 13: Gateway, On receipt 2.2. introduction to the lufp7 gateway

Advertising
background image

14

2. Hardware Implementation of the LUFP7 Gateway

2.1. On Receipt

After opening the packaging, check that the following element is there:

• One LUFP7 Profibus-DP / Modbus RTU gateway.

2.2. Introduction to the LUFP7 Gateway

The cables and other accessories for connecting to Profibus-DP and Modbus networks need to be ordered
separately.

c

d

e

g

f

h

Modbus RTU

Configuration

Legend:

c

Detachable power connector for the
gateway (

24V ±10%).

d

Female RJ45 connector to a PC
running AbcConf configuration
software.

e

Female RJ45 connector for the
downstream Modbus RTU network.

f

Six diagnostic LEDs.

g

Removable cover for the coding
wheels used to configure the gateway,
shown and described in chapter 2.7
Configuring the Profibus-DP
Communication Features, pa
ge

22.

The label describing the LEDs is stuck
onto this cover.

h

Female Profibus-DP connector.

Advertising