State Industries Premier Power Vent DV Series GP6 50 HTPDT 121 Series User Manual

Page 27

Advertising
background image

27

concentrIc vent InstallatIon

This appliance is certified for concentric venting with concentric vent

kit #9003910105 and #9006328005. Follow instructions below for

proper installations.

KIt coMponents

Each kit is comprised of the following:

Item

Description

Qty.

Rain Cap

3 in.

1

SDR-26 pipe

4 in. dia.

1

SDR-26 pipe

2½ in. dia.

1

Y Concentric Fitting

3 in.

1

Installation Instructions

194504

1

Field supplied pipe and fittings are required to complete the

installation.

This concentric vent termination kit may be used with 3 inch diameter

pipe systems.

safetY consIderatIons

Installing and servicing water heating equipment can be hazardous

due to gas and electrical components. Installation and service of

the concentric vent termination requires ability equivalent to that

of a qualified installer or service agent, see page 7. All precautions

in the literature, on tags, and labels attached to the unit must be

observed.

Follow all safety codes. Wear safety glasses and work gloves.

fIGure 20.

fIGure 21.

* dimension 21 1/8 in. may be lengthened to 60 in. maximum.

dimension 21 1/8 in. may also be shortened by cutting the

pipes, provided in the kit, to 12 in. minimum.

** dimension 39 will change accordingly as dimension

21 1/8 in. is lengthened or shortened.

Do not use field-supplied couplings to extend pipes. Airflow

restriction will occur and the heater pressure switch may cause

intermittent operation.

InstallatIon procedure 1 roof terMInatIon, see

figure 23.

1. Determine best location for termination kit.

note: roof termination is preferred since it is less

susceptible to damage, has reduced chances to intake

contaminants, and less visible vent vapors.

2. Cut 1 hole (5 in. diameter)

3. Partially assemble concentric vent termination kit.

a) Cement Y concentric fitting to larger diameter kit

pipe, see Figure 20.

b) Cement rain cap to smaller diameter kit pipe, see Figure 22.

fIGure 22.

note: Instead of cementing the smaller pipe to the rain cap,

a field-supplied stainless steel screw may be used to secure

the 2 components together when field disassembly is desired

for cleaning, see figure 22.

when using alternate screw method, drill clearance hole in

rain cap and pilot hole in vent pipe for screw size being used.

failure to drill adequate holes may cause cracking of pvc

components, allowing combustion products to be recirculated.

failure to follow this warning could result in personal injury

or death.

do not operate the heater with rain cap removed or

recirculation of combustion products may occur. water may

also collect inside larger combustion-air pipe and flow to

the burner enclosure. failure to follow this warning could

result in product damage or improper operation, personal

injury or death.

4. Install Y concentric fitting and pipe assembly through

structure’s hole and field supplied roof boot/flashing.

fIGure 23.

note: do not allow insulation or other materials to accumulate

inside pipe assembly when installing through hole.

Advertising