P R E P A R A T I O N

Preparation Overview Required for Setup

The purpose of the preparation section is to help

you prepare your machine for operation. The list

below outlines this basic process. Specific steps

for each of these points will be covered in detail

later in this section.

The typical preparation process is as follows:

1. Unpack the lathe and inventory the contents

of the box/crate.

2. Clean the lathe and its components.

3. Identify an acceptable location for the lathe

and move it to that location.

4.

Level the lathe and bolt it to a workbench or

stand.

5. Assemble the loose components and make

any necessary adjustments or inspections to

ensure the lathe is ready for operation.

6. Check/lubricate the lathe.

7. Connect the

lathe to the power source.

8. Test run the lathe to make sure it functions

properly.

9. Perform the spindle break-in procedure to

prepare the lathe for operation.

To complete the preparation process, you will

need the following items:

For Lifting and Moving

• Additional people for lifting the lathe (at

least two)

For Power Connection

• A power source that meets the minimum

circuit requirements for this machine (review

Power Supply Requirements on the next

page for details)

For Cleaning & Assembly

• Cotton rags

• Mineral spirits

• Quality metal protectant oil

• Safety

glasses

• Bench mounting hardware as needed

• Precision level