TROUBLESHOOTING AND REPAIR

GAS SOLENOID

LEADS 552 &553

GAS SOLENOID VALVE TEST

(continued)

FIGURE F.4 – LEADS 552 & 553

TEST PROCEDURE

1. Remove power to the LN-15 machine.

2. Perform the Cover and Spindle

Mount removal procedure.

3. Locate and remove the two solenoid

leads 552 & 553 from the solenoid
valve. See Figure F.4.

4. Make sure the gas supply for the

solenoid is hooked up, and then apply
12 VDC to the gas solenoid.

5. If the solenoid activates and allows

gas flow, then the solenoid valve is
good.

NOTE: There should not be any gas flow

until the solenoid is activated.

6. If the solenoid does not activate and

allow gas to flow, then the solenoid is
faulty. Replace.

7. The normal solenoid resistance is

approximately 20 to 21 ohms.

8. Normal voltage (with gun trigger

activated) measured at the solenoid
is 6.5 VDC (leads 552 & 553).

9. If the voltage is not present at leads

552 & 553 the feed head control
board may be faulty.