Installation, Optional features installation, General panel installation guidelines – Lincoln Electric IM658-A User Manual

Page 21: Boom and bench conversions

Advertising
background image

A-13

INSTALLATION

POWER FEED 10 DUAL

A-13

OPTIONAL FEATURES INSTALLATION

A number of Optional Features are available for use
with Power Feed 10 Dual. Some Installation informa-
tion is provided in this section, REFER TO THE
INSTRUCTIONS THAT COME WITH EACH KIT FOR
DETAILED INFORMATION REGARDING INSTALLA-
TION.

OPTIONAL PANELS FOR CONTROL BOX

All optional panels for the control box are described in
the ACCESSORIES section of this manual along with
their installation instructions as are all other pieces of
optional equipment.

The Power Feed Control Box is designed to accept
three control panels, two ʻlargeʼ and one “small” pan-
els are needed to make up a complete control panel
for the Control Box. Panels can be mounted in one of
three positions: Upper, middle and lower.

Each Power Feed 10 Dual is shipped with a
Control/Display (CD) panel, a large panel, installed in
the upper position, and a CV/Gouge (CV/G) panel
(another large panel) in the lower position. The middle
position has a Head Select (HS) panel.

The CD panel must be installed in every Control Box.
The small panel can be the Head Select panel or a
Dual Procedure / Memory panel. The remaining large
panel can be one of the following: CV/G, M, MX2, or
MSP2. The features of each are described in the
Operation section of this manual.

There are extra mounting holes in the upper and mid-
dle positions which allow the upper two panels to be
interchanged. (Instead of the upper, middle and lower
panels being large, small and large, they could be
installed in the order small, large, large.) This may be
done for convenience sake, or to take advantage of
the Large Security Door option.

Note: The CD panel must be installed in either the
middle or the upper position; its harness is not long
enough to allow installation in the lower position.

GENERAL PANEL INSTALLATION
GUIDELINES:

Installation or removal of any panel can be done with
only a Phillips screwdriver after the system power is
turned off. To remove a panel, remove the two screws
holding it in place, remove the push-on chassis
ground wire and remove the harness connection to
the Control Box main PC board. To install any panel,
reverse that process. Turn power back on when com-
plete (option panels are only recognized at power up.
Do not install panels with the power on.) Note that
removal or installation of any panel may also require
the removal of the other panel, in order to have easy
access to the PC board connectors. Detailed installa-
tion instructions are shipped with each option panel.

BOOM AND BENCH CONVERSIONS

The modular design of these feeders allows them to
be converted from bench to boom models or vise
versa. Some additional parts are required to make this
conversion.

Materials Required for bench to boom
conversion:

K1548-1 Linc-Net receptacles, installs in control
box.

K1543-”Length” Linc-Net Control Cable, Control
cable between control box and wire drive.

Materials Required for boom to bench
conversion:

L10286-1 Wire Reel Stand.

Advertising